You said...……………………….
'To be done this week/weekend:
- fit wiring loom + attempt to start the car
- fit digital dash + all gauges
- fit brakes + bleed
- fit clutch line + bleed
- fit headlights + taillights
- fit passenger seat + seat belt
- fit intercooler piping'
That list would take me weeks/months
The car is really coming together now, that loom is really tidy. Would you mind sending a PM with how much it cost? Great shout on the lights, the headlights especially have proven to be a great job on my car, I’m delighted with them!
Looks like you're not short of other things to do while you wait, lol
Brilliant project this, bet you can't wait to get out on the road Must be a special feeling, knowing you did it all yourself, knowing literally every nut and bolt!
that is something else!Seeing as things are quiet around here at the momentlol, and I know you all like the se7en content, here’s mine as of this evening just after an engine and gearbox rebuild so hopefully I’ll finally be able to get the season started at last.
Hi Rob, do those lights pass MOT? I wouldn't mind fitting a set to mx5 to replace the standard 7 inch halogensThe car is really coming together now, that loom is really tidy. Would you mind sending a PM with how much it cost? Great shout on the lights, the headlights especially have proven to be a great job on my car, I’m delighted with them!
Hi Rob, do those lights pass MOT? I wouldn't mind fitting a set to mx5 to replace the standard 7 inch halogens
Have you made your dash panel yet?
I made a new one last weekend and home-flocked it.Was a bit skeptical but it turned out good.View attachment 236991
Seeing as things are quiet around here at the momentlol, and I know you all like the se7en content, here’s mine as of this evening just after an engine and gearbox rebuild so hopefully I’ll finally be able to get the season started at last.View attachment 237984View attachment 237985View attachment 237986