IL
RMS Regular
- Messages
- 10,279
- Drives
- 981 GTS
- Thread Starter
- #826
A few cover sections where finalised for the fuel system, An access panel to the fuel pump etc.
Fire wall around the filler area, probably would have been find for scrutineering but now is the time to do it.
The Passengers foot well finished for mounting up the Fuse boxes, relays, Battery, ECU and other Gadgetry
The wiring Loom has also had its 1st fix, the legs of the loom have been made up and all holes opened for passing wires and through bulkheads
and routes worked out.
The bulk head was close and sealed off around the steering column with a nicely fabricated removable panel.
Fire wall around the filler area, probably would have been find for scrutineering but now is the time to do it.
The Passengers foot well finished for mounting up the Fuse boxes, relays, Battery, ECU and other Gadgetry
The wiring Loom has also had its 1st fix, the legs of the loom have been made up and all holes opened for passing wires and through bulkheads
and routes worked out.
The bulk head was close and sealed off around the steering column with a nicely fabricated removable panel.